直埋电力电缆动态增容和双线增容策略研究

直埋电力电缆动态增容和双线增容策略研究

Research on Dynamic Capacity Increase and Double-Circuit Capacity Increase Strategy for Buried Power Cable

Research on Dynamic Capacity Increase and Double-Circuit Capacity Increase Strategy for Buried Power Cable

doi:
10.3969/j.issn.1005-2992.2016.05.002
摘要:
为充分挖掘电力电缆裕量,可根据需要对现行电缆实施动态增容。电缆导体温度是动态增容的重要依据,基于有限元法计算电缆导体温度,根据电缆导体允许工作温度(90℃)确定允许增容时间。计算单线增容允许增容时间,绘制应急负荷-允许增容时间曲线,供电力调度参考。双线增容时有双线同时增容、单线轮流增容两种方案可供选择,计算两种方案所能提供的增容时间,确定最优增容方案。结果表明,双线同时增容能提供更长的增容时间,为最优增容方案。
Abstract:
In order to make full use of power cable allowance,it is necessary to add transmission capacity of the running cable according to need dynamically. Cable conductor temperature is the important evidence for dy-namic capacity increase. This paper calculates conductor temperature based on finite element and determines permitted capacity increase time on the basis of the permitted conductor temperature(90℃) of the cable. For single-circuit capacity increase, permitted capacity increase time is calculated and the emergency load-permitted capacity increase time curve is drawn,which can give a reference for power cable operation and man-agement. For double-circuit capacity increase,there are double-circuit simultaneous capacity increase and sin-gle-circuit rotational capacity increase two schemes to choose from. The capacity increase time of two schemes is calculated and then the optimal capacity increase scheme is determined. The results show that double-circuit simultaneous capacity increase can provide longer capacity increase time which is the optimal capacity increase scheme.
作者 吴文克 [1] 鲁志伟 [1] 张航 [1] 敖明 [2] 刘同同 [3]
Author: WU Wen-ke[1] LU Zhi-wei[1] ZHANG Hang[1] AO Ming[2] LIU Tong-tong[3]
作者单位
  1. 东北电力大学 电气工程学院,吉林 吉林,132012
  2. 吉林省电力公司 电力科学研究院,长春,130021
  3. 国网安徽蚌埠市供电公司,蚌埠,233000
期 刊: 东北电力大学学报
Journal: Journal of Northeast Dianli University (Natural Science Edition)
年,卷(期) 2016, 36(5)
分类号 TM614
关键词: 有限元 知识脉络 允许增容时间 知识脉络 单线增容 知识脉络 双线增容 知识脉络
Keywords: Finite element Permitted capacity increase time Single-circuit capacity increase Double-circuit capacity increase
机标分类号 TM7 TM
基金项目
参考文献和引证文献
返回顶部参考文献
返回顶部引证文献
返回顶部本文读者也读过
返回顶部相似文献
返回顶部相关博文

知识产权声明| 服务承诺| 联系我们| 人才招聘| 客户服务| 关于我们

京ICP证:010071  互联网出版许可证:新出网证(京)字042号  京公网安备11010802020237号
万方数据知识服务平台--国家科技支撑计划资助项目(编号:2006BAH03B01)©北京万方数据股份有限公司  万方数据电子出版社