BIM技术在高装配率变电站施工进度优化中的应用

BIM技术在高装配率变电站施工进度优化中的应用

Application of BIM Technology in Construction Schedule Optimization of High Assembly Rate Substation

Application of BIM Technology in Construction Schedule Optimization of High Assembly Rate Substation

doi:
10.7672/sgjs2018090129
摘要:
基于BIM技术中的信息化建模和可视化模拟,研究高装配率变电站施工进度优化的关键技术.在传统施工进度优化方法的基础上,提出了BIM技术与传统施工进度管理技术相结合的概念,建立了施工进度计划编制与优化的实现方法.结合某220kV高装配率变电站工期优化的工程实例,验证了本文所提出方法的可行性和适用性.
Abstract:
Based on the information modeling and visual simulation in BIM technology,the key technology of the construction schedule optimization of high assembly rate substation is studied. On the basis of the traditional construction schedule optimization method, the concept of combining BIM technology with traditional construction schedule management technology is put forward, and the implementation method of construction schedule planning and optimization is established. Combined with the engineering example of a 220kV high assembly rate substation, the feasibility and applicability of the proposed method is verified.
作者 于彬 [1] 张翼虎 [1] 陆东 [2] 李建辉 [2] 张辰泽 [3]
Author: YU Bin[1] ZHANG Yihu[1] LU Dong[2] LI Jianhui[2] ZHANG Chenze[3]
作者单位
  1. 江苏科能电力工程咨询有限公司,江苏 南京,210036
  2. 国网内蒙古东部电力有限公司,内蒙古 呼和浩特,010020
  3. 江苏师范大学地理测绘与城市规划学院,江苏 徐州,221116
期 刊: 施工技术 ISTIC EI SCI PKU CSSCI
Journal: Construction Technology
年,卷(期) 2018, 47(9)
分类号 TU17
关键词: 变电站 知识脉络 高装配率 知识脉络 施工进度 知识脉络 工期优化 知识脉络 建筑信息模型 知识脉络 应用 知识脉络
Keywords: substation high assembly rate construction schedule optimization building information modeling(BIM) application
机标分类号
基金项目 2017国家电网公司科研项目:依托工程基建新技术研究应用项目——施工技术类(1)严寒地区变电站土建工程2期优化方案研究
参考文献和引证文献
返回顶部参考文献
返回顶部引证文献
返回顶部本文读者也读过
返回顶部相似文献
返回顶部相关博文

知识产权声明| 服务承诺| 联系我们| 人才招聘| 客户服务| 关于我们

京ICP证:010071  互联网出版许可证:新出网证(京)字042号  京公网安备11010802020237号
万方数据知识服务平台--国家科技支撑计划资助项目(编号:2006BAH03B01)©北京万方数据股份有限公司  万方数据电子出版社